Friday, August 7, 2009

finish it in August!

Kim has issued a challenge for whoever wants to join in to finish things in august. Sounds like a good excuse to see what i can do with those swap blocks sitting in that big basket! I'm not sure if she has a real classification for UFO's or if finished just means finished. I'm going to count everything that gets finished nomatter when i started it. So here goes the list:
  1. M&M king size jacob's ladder(basted and ready to quilt)
  2. Valentine runners(4 or 5)-ready to baste
  3. Halloween runners(4 or 5)-ready to baste
  4. heart swap blocks-need to be sashed together
  5. pink and brown swap blocks-need to be sashed together
  6. 30's round robin-basted
  7. quilty ladies-basted
  8. at least 3 row robins-still in rows
  9. stack and slash hearts-need squaring and set together
  10. stack and slash shamrocks-need LOTS of work
  11. black and white swap blocks-need to be sashed together
  12. christmas runners-3 ready to baste

This is not a complete list of my ufo's nor do i expect to get all these done in August but it is all i can think of off the top of my head. And in my case done means bound and ready to use even though Kim says tops count on big projects. Here's Kim's blog if you want to read the rules: http://kimsbigquiltingadventure.blogspot.com/2009/08/da-rulz.html

1 comment:

swooze said...

So what does the hanger look like now? You must have gotten more batting :D